Laytime starts from a valid Notice of Readiness, not from arrival. Here is what makes a NOR valid, how turn time delays the clock, and the disputes that decide when demurrage begins.
Laytime does not start when the vessel arrives — it starts from a valid Notice of Readiness. Getting that moment right is where a large share of demurrage disputes begin.
The Notice of Readiness is the master's formal declaration that the vessel has arrived and is ready in all respects to load or discharge. Once it is validly tendered (and any grace period passes), the laytime clock begins.
A valid NOR generally requires that the vessel is:
Many charters add a grace period after NOR — the turn time (e.g. 6 hours) — before laytime counts. Others start on berthing. The clause wording controls it.
Common issues include a NOR tendered before the vessel was truly ready, tendered outside permitted hours, or tendered without free pratique where required — any of which can invalidate it and push back when laytime commenced. Because the commencement point flows straight into the laytime calculation, a shaky NOR is one of the first things to test when you challenge a claim.
DemurrageIQ reads the SOFs, calculates laytime and drafts your counter-claim letter — in minutes.
Request access →